Add to Gallery: | Add this photo to a Gallery |
Category: | Cycleway: An example of good practice |
Tags: | None |
Date time: | 10.00am, Tuesday 10th October, 2006 |
Time line: | Earlier | Later |
Facing: | North west |
Added by: | amassie |
Copyright: | CC Attribution-Share Alike (by-sa) |
Download: | View full-size original |
Credit: | A Massie |
Area: | Hungerford |
Good merge from pavement cycle track to on road lane, although too narrow, this could have comfortably taken another 0.5m of road space.
Comments reflect the views of the original submitter only.